What are the requirements for my site?

You need enough space to accommodate the studio or dwelling, the ability to legally have an auxiliary dwelling/building on your property, and we need to get a crane parked within 80’ of your desired location. Typically, the larger the aux box, the shorter the reach for the crane.

How do I prepare my site?

We can prepare your site, or you can (with our guidance), or you can hire a contractor. We will guide you through the process. The bare minimum site requirement is to prepare the landing spot for your aux box and to run electrical from your house to the landing spot.

How long does it take?

Roughly 12-18 weeks from purchase contract to delivery, depending on the model you choose, our production schedule and the permitting requirements. Smaller models can be shorter lead times. Larger models can be longer lead times.

How big is an aux box?

It depends on which model you choose. We have offerings from 97 - 620 sq ft. Check our models page for more details.

Can I customize my aux box?

Yes! We have a number of choices for you to make for your unit. Choose your layout orientation, interior colour scheme, and select materials. We will also listen to additional “outside the box” customization requests.

Are aux boxes CSA approved ?

Yes, we build our Model 240, & Model 300 in compliance with CSA Z240 standards & the Model 620 in compliance with CSA A277.

How do I set up utilities for my aux box?

The electrical hook-up must be performed by a certified electrical contractor. The electrical site-work is permitted by the local electrical authorities. If your unit has water, the plumbing will also need to be set up by a certified professional.

Can I heat/cool my unit?

Yes! We offer a mini-split AC/heat pump as an optional upgrade to your unit. All models come standard with an infrared heating panel on the ceiling. Our 240 models have infrared in the living space, and electric in-floor heating under the tile in the bathroom.

How does payment work?

A 50% installment by wire transfer, cheque or bank draft is required to begin your project and a 40% 2nd instalment payment is collected prior to shipment of your aux box. The final 10% is collected once the unit is installed to your satisfaction. For all pre-project expenses, we collect payment by credit card on the purchase page, or by E-transfer or wire-transfer. Installment and financing options may be available, and can be discussed on a project basis.

Does aux box offer financing?

Not yet!